Disruption due to construction 5.6. Bridge construction 3.6.5. Road improvements 3.5.

The bypass, known as the Inverness Trunk Road Link (TRL), is aimed at resolving Inverness’s transport problems and has been split into two separate projects, the east and west sections. For the next 30 miles the road runs across the desolate Rannoch Moor with long straights and little habitation. The route becomes a trunk road at the A898 Dalnottar Interchange, before bisecting Dumbarton. The 30-mile section from Balloch to Tarbet was reconstructed in the 1980s and a further improvement at Pulpit Rock was completed in 2015. Many sections of Telford’s road took a new alignment, most notably along the western banks of Loch Ness. The first road to be constructed in the corridor of the existing road dates from the early 1700s, with work overseen by General George Wade.

The original route of the A82 as classified in 1923 was described as “Glasgow – Clydebank – Dumbarton – Alexandria – Crianlarich – Ballachulish – Fort William – Fort Augustus – Inverness” and closely follows the route as designed by Telford. Now inside Inverness, the road passes Queen’s Park stadium and heads towards the city centre. There is a short diversion from the loch at Invermoriston, where the A82 crosses the River Moriston and the A887 provides another route back to the A87 and Skye. The final 36 miles (58 km) from Fort Augustus to Inverness is mostly on the alignment of Telford’s Road, running along the western shore of Loch Ness.

The route as far as Tarbet has been upgraded to a modern standards, but between Tarbert and Ardlui, is unimproved and congested during busy periods. After bypassing Alexandria, the dual carriageway ends, proceeding as single carriageway for the next hundred miles. It becomes dual carriageway at Garnavel Hospital, the start of a boulevard type road constructed in the late 1920s. It passes several notable Scottish landmarks including Loch Lomond, Rannoch Moor, Loch Ness and the Caledonian Canal. A route through the moor was followed by Major William Caulfeild, and a later route was constructed by Telford.

This bridge was constructed in 1932, bypassing the 1850s Bridge of Oich, a Taper Suspension Bridge built by James Dredge. The A82 runs towards the centre of Loch Oich, passes Invergarry Castle, and crosses the River Garry. The road here, as it was previously along Loch Lomond, is tightly situated between Loch Linnhe and the mountains up to Fort William, which is located about 7 miles (11 km) from the Corran narrows. This bridge had been proposed since the mid-1960s, and construction began in late 1972 at an estimated cost of £2m (£16 million as of 2025). The road runs to the west of Crianlarich village itself on a 0.81-mile (1.3 km) bypass completed in 2015. At Pulpit rock, the road was single-track, with traffic flow controlled by traffic lights for over 30 years.

It links up several settlements including Crianlarich, Glencoe, Fort William, Fort Augustus, and Inverness. The A82 is one of Scotland’s longest roads, stretching for 175 miles from Glasgow to Inverness through the west of Scotland. In 2015, a section of the A82 between Invermoriston and the published page Drumnadrochit closed following a rockfall, requiring an official detour of 120 miles (190 km). In April 2013, Transport Scotland announced further plans to close the A82 at Onich for resurfacing, but they postponed the work due to an adverse reaction from local business owners. The Scottish Herald reported that, if the road closed, a journey from Oban to Fort William, normally 44 miles (71 km), would require diverting via Loch Tay and Ballinluig, a journey of 166 miles (267 km).

In August 2011, John Grieve, owner of Lochleven Shellfish Company, attempted to challenge Transport Scotland’s plans to close the A82 overnight five days a week, for a period of up to three weeks, around the village of Onich, between Glencoe and Fort William. Because most of the A82 is single carriageway, and the local geography means a detour can be a significant distance, there is a history of strong protest about closing the road. Former Scottish First Minister Alex Salmond stated whilst in office that the government is “committed to improving the A82”, and he allocated £500,000 in June 2011 to study key areas where the route could be improved. The current diversion over the Friars Bridge towards the modern A9 opened in 1986, in co-ordination with the redevelopment and extension of Inverness docks in the early 1980s and the rerouting of the A9 onto the Kessock Bridge. Work was delayed following a disagreement with the Scottish Ministry of Transport and local councils over funding. The current alignment began construction in 1927, and included a general widening of the carriageway from Tyndrum to Glencoe to 18 feet (5.5 m).

Tourists find the A82 a popular route because of its scenery, and it serves as a main artery for commercial and heavy goods traffic. The route is derived in several places from the military roads constructed through the Highlands by General George Wade and Major William Caulfeild in the 18th century, along with later roads constructed by Thomas Telford in the 19th. Along with the A9 and the A90 it is one of the three major north–south trunk roads connecting the Central Belt to the North.

From Glasgow to Dalnottar, the route is now the responsibility of Glasgow City Council and West Dunbartonshire Council in their respective areas. The A82 was one of the first trunk roads, which were created in 1936, and has historically been described in official government documentation as part of the “London – Carlisle – Glasgow – Inverness Trunk Road” in which the A6 and A74 made up the rest of the route. Summary of construction impacts